

This is one of the little jobs we have on the go at the moment. This particular client wanted to tie in all areas and required additional steps to make access easier and to elimate slippery aspect.
First of all we set a couple of steps (prior to Christmas). Once cured (as fresh concrete needs to be cured before the application of Resin Bonded Stone) we prepared the area to be covered, filled where necessary and masked off areas as required to prevent covering where the Resin Bonded Stone is not required and a general brush up of the area.Here are some updated views now works have been completed. A Natural finish bringing everything together.


No more slippery steps and a protective and durable finish.
No comments:
Post a Comment